Fairview Township: Phase 1 Sanitary Sewer Extension Project

Enter your property address to (street address, city and state) below and select the magnifying glass to zoom to your property.
Example: 400 Lewisberry Road, New Cumberland, PA                            
DO NOT CONNECT TO THE SEWER UNTIL YOU RECEIVE A LETTER FROM THE TOWNSHIP. MOST LATERALS HAVE NOT YET BEEN CONSTRUCTED.

PHASE 1 PROJECT AREA:The Project Area can be generally described as the entire Timber Ridge neighborhood, and from 392 Lewisberry Road to and including 474 Lewisberry Road

PROJECT DURATION AND WORK HOURS: The project duration is anticipated to be approximately 9 to 12 months.

1. Construction and Restoration Information
2. Construction Schedule
3. Frequently Asked Questions
4. Pre-Construction Neighborhood Meeting
5. Construction Drawings (Large File)
6. Typical Building Sewer to Lateral Connection
7. Grinder Unit Information:
      7a. General Information
      7b. Installation Instructions
      7c. Properties Requiring Grinder Units or
           Grinder Units and Low Pressure Force Mains

Project Status Legend


Return to Fairview Township

(c) Copyright 2014. GHD, 1240 North Mountain Road, Harrisburg, PA 17110.  All Rights Reserved.